GES-DIRTGLUE – PRODUCT TESTIMONIAL: FOR “ MASONPROOF”

 

Dear Mr Scott Flinn,

 

As you are aware we have been trialing your GES product “ Mason-Proof” to assist us with Masonary, Blocks, Bricks, & Plaster wall Water-Proofing solutions over the past 12 months.

 

Our Trial sites;

 

  • J Gardner Build: Sloped Section / Two Story / with Block Wall basement Address: 51 Discovery drive, Fletcher NSW 2285.

Action Plan:

  • Water-Proof the Ground floor Basement Walls
  • Negative Walls (Inside Wall)
  • Positive Walls (Outside Wall facing the Ag-Soil & Water pressure side)

GES MasonProof – Waterproofing Application Process Date: Went ahead Jan 2017 Moisture Trial Testing Performed: November 2017

Showed Moisture readings;

Positive Wall Readings: Tested & showed moisture at between Low 290 to 395 high Negative Wall Reading: Tested & showed moisture at between Low 190 to 290 high The Minimum Aust-Housing Moisture Reading Standard: Is Under 600

Solution:

Ges-MasonProof was applied at an application rate of 14 to 1 litre of MP

Summary Outcome;

August/2017; 8 months on, The walls are still dry,

Further Tests: Feb 2018 in our 2nd tests we performed, Again these walls are still dry at the same readings, following a wet 2018 winter season.

In our mind a positive result for us as a business.

 

 

 

2).   GJ Gardner Build: Home Dwelling

Divided by a Masonary Brick center wall, Between home living & Car Garage Address: Elcho Street, Hamilton Newcastle NSW 2300

Action Plan:

  • Water Proof Center Brick Divider walls, Between Living Side & Garage,

Current problem, Water leaking through flashings & Moisture in in the builder bricks And block wall.

Solution:

  • Step one; GJ Builders sealed all cracks & gaps in the Center line Brick
  • GES-Dirtglue Applicators; Used MasonProof to water proof the Masonary Bricks MasonProof Application Mix ratio 14 to
  • Application Date: 3rd April 2018
  • Inspection Date: 4th  April 2018

Which included a Water Splash test onto the exterior outside walls. And also the Internal walls as well.

 

Our Summary Outcome:

This was a very difficult site, The home owners supplied their own Aged Bricks from a Melbourne VC, Historical site.

Some of these bricks had defects, Cracks, and a lot of moisture in them, I advised them this will create unexpected problems if we don’t get this right and sadly this proved to be true.

 

GES-Dirtglue offered excellent Sales & Tech support through the following;

  • Your on site inspection & Appraisals process
  • Solutions and advice to solve the Water Dampness issues
  • Picking the right product: MasonProof
  • And working through how to fix and apply MP to the
  • Overall the Home is still water tight, No signs of
  • We have a very happy customer, which is the
  • And we are very grateful of your support shown towards GJ Gardner & My

 

 

Like to thank you & the GES-Dirtglue team,

 

 

 

 

 

Mark Eddy

Managing Director

G.J Gardner Homes Newcastle

 

Trial Site 1). 51 Discovery Drive, Fletcher NSW

Before;

After, We Waterproofed with MasonProof, Note the Soil Earth worked up to the Outer Walls.

Trial site 2). Elcho Street, Hamilton, Newcastle NSW

Before;

After;

MasonProof is applied, Check the Water beads to show it working.

MASONPROOF – WATERPROOFING CONCRETE CAR PARK PRODUCT REPORT / TREATMENT PROCESS

MASONPROOF – CLEAN, WATERPROOFING TO SAVE MONEY THROUGH REDUCED EXTRA RE-WORK
GBL COMMERCIAL CARPARK
Start Date: August 2017

BEFORE SHOWING ALGAE / MOSS / DIRTY GRIME

DURING

 

DURING WATERBLASTING CLEAN DOWN, THE STAINS FROM THE TREES SAP TOUGH TO WASH OFF/

DAY 1

CAR-PARK WASHED DOWN/PREPPED AND READY TO MASONPROOF AND SEAL/

DAY 1

 

WE PRESSURE WASHED THE WHOLE CARPARK, DATED; AUG 2017

STAGE ONE; MASONPRROF APPLICATION/ DAY 2

FINAL APPLICATION COMPLETED / DAY 2

THIS PHOTO SHOWS THE BEEDING EFFECT WHICH TELLS YOU THE CONCRETE SURFACE IS SEALED FROM THE ELEMENTS

THE WATER BEADING EFFECT SHOWS THE MASONPROOF TREATMENT IS COMPLETE & WORKING

PHOTO UPDATE: 07 / MARCH 2019

NOTE: THE UNTREATED GREY AREAS GOING DARKER WITH GROWING AGLIE/MOSS, COMPARED TO THE LIGHTER MASONPROOFED TREATED AREAS, NO COLOUR CHANGE, STILL CLEAN

Dear Scott, and Jeff (GESA & GTS)

A few words of thanks, I have to admit I was not that convinced in the beginning your MasonProof solution would control our Moss, Black & Green Algie, or Tree Sap stains would actually work on our Carpark areas, you treated back in August 2017.
Every time we get winter Rains, These Photos show how good “MasonProof” Continues to work for us..

Today 07 March 2020, is now approx. 32 months on, There has been “No regrowth of Algae, Moss, and Blackening, nor dark tree sap stains that normally returns over the damp winter seasons.

My Pressure washing costs have reduced to Nil through this period, so its time treat the rest of our Carparks now Pls.
“Simply put – Your MasonProof solution really does work” let’s get the rest of the car park sorted and can I get some for home.

Martin Omara
CEO of, Global Brands Liquor Pty Ltd, Cameron Park, NSW

 

SAND-STONE MASONPROOF TREATMENT

2 years ago, June 2018, All the Sand-stone retainer walls Blocks in this Picture were Pressure washed.

On the left of this Picture, The 3 x Sand-Stone Blocks 1.2 x 600mm x 600mm were Treated with a MASONPROOF
Treatment process.
Upon a followup Inspection today 12th June 2020,
It is amazing the retention of the Vibrant colours and how clean the Sand-Stone Blocks still are today.

6 MONTHS AFTER PRESSURE WASH

AFTER 2 YEARS

 

“FINALLY A TREATMENT THAT ACTUALLY WORKS”

GES Global Welcomes GTS (Hai Nan) Environmental Solutions Co Ltd. to the Green Track Global Network

china welcomed to GES Greentrack

让我们庆祝

Exciting times at Green Track Solutions! Last week we welcomed to the GTS family, Yu Zhang (Larry) & GTS (Hai Nan) Environmental Solutions Co Ltd.
We look forward to working with them as our exclusive Chinese distributor.
Their visit was action-packed, with an official signing of the exclusive agreement, product demonstrations, laboratory and product + solution training.

Bolster the Bottom Line: Keep Your Hydroseeding Equipment Running All Year Round with GES Products

We understand that when it comes to hydroseeding and hydromulching you’ve got a lot of options to work with. Options are good. They keep the industry “honest,” or, at least that’s the hope.

Being headquartered in New Hampshire, we’ve been staring at a lot of hydroseeding and hydromulching activity on the side of highways, and the countless arrays of construction projects that happen during the spring, summer, and fall months. Some of it will be considered a success. Some of it “will suffice.” And some of it will fail. It’s a part of the “business.” It’s often not in your best interest to go with “the cheapest quote.”

With that said, we want to be as honest with you as we possibly can. It comes in the form of a proclamation – not because we’re looking to exude a degree of overconfidence – but rather, because our pride and reputation is in the products we produce. Therefore we’re here to tell you that DirtGlue is the finest product on the market when it comes to contractors and their quest to find a multi-faceted solution to their hydroseeding and hydromulching needs and/or operation. Sure, others have likely made the claim, but again, we’re coming at you as unbiased as we can possibly be. When we created our suite of products we studied what others were doing. We got to the root of common problems and improved upon areas of strength and we came up with our own, unique solution that, quite simply, exceeds expectations and flat out lasts. The proof is in the science. The science is in the “glue.”

Consider the following:

Using DirtGlue Polymer Emulsion instead of your regular tackifier when you “get to work” on a project is a much more effective and cost competitive solution when it comes to preventing runoffs and accelerating germination, which is the ultimate goal when you’re hydroseeding, right?

The unique bonding capabilities built in to the inherent core of our polymer technology keep soil, seeds, nutrients, and cellulose mix in place during heavy rains and extreme runoff situations (we’re again looking right at those jobs on the sloping banks at the side of the interstate on our commute to work…)

The long and short of things is this: DirtGlue Polymer Emulsion eliminates costly and time-consuming re-sprayings and touch-ups and every application gains a happy and satisfied customer, and, a well executed, environmentally sound jobsite.

DirtGlue Polymer Emulsion combined with your hydroseeding mix:

  • Holds water in the soil longer (thus feeding into a sought after greenhouse effect)
  • Protects the soil and plants from rapid dehydration
  • Enables two to five days of earlier germination
  • More than a 20% increase in the germination rate of grasses
  • Reduction in soil losses due to strong precipitation (sediment control)
  • Prevention of loss of fines due to wind erosion (dust control)

We all know that cost is at the heart of the things we choose in life. Cheaper is not cheaper in the grand scheme of things. Cheaper means (quite often), lesser quality. And lesser quality gives way to greater margins of error, and, as we mentioned earlier, more follow-up to touch up jobs, and, in some cases, completely redo a task to fulfill a contract agreement. By just adding one cent per square foot, with DirtGlue Polymer Emulsion you are able to guarantee the job and offer peace-of-mind to not only the customer, but also, also, you. You don’t have to worry how it’s going to work, because, quite frankly, it just works. In the end, the cheaper solution will wind up costing you a little bit more at the outset.

And what’s more is this:

The GES line of products can keep your hydroseeding equipment operable and fueling your bottom line for the entire calendar year. Who wouldn’t want to take a more well rounded means of control over their expensive equipment for all four (potential) seasons rather than having it sit idle for many months at a time? How might you achieve this? Let’s give you an overview…

DirtGlue® polymer – This product is used primarily to stabilize embankments to prevent erosion, and help contractors with regulatory issues, erosion control, stockpile capping, and BMPs for SWPPPs
(Spring, Summer, Fall)

DustLess® dust suppressant – Quite simply, apply dust control on high traffic areas and eliminate the need to use water while achieving far superior results.
(Summer, Fall)

ArenaKleen® dust control – Your equipment can be used to apply our ArenaKleen dust control product to riding arenas (both indoor and outdoor), offering safety to not only the horses stomping around in the arena, but people who are subject to the adverse effects of breathing in potential dust threats.
(Winter, Spring, Summer, Fall)

CompoMulch™ organic blend hydromulch – As mentioned above, this product is far superior to the typical wood fiber and paper products used for hydromulch. Our custom blended CompoMulch contains 50% compost mixed with a 50% special blend of short vegetable fiber (no paper and less prone to clogging nozzles).
(Spring, Summer, Fall)

So give us a call and add to your application technology / operative arsenal what many in your industry are already doing – eliminate the seasonality of your business – make it year round!